Paint shopPony Luxury Coating
Pony L11000 (11x5x5)
Paint shop
Pony Luxury Coating
Pony L11000 (11x5x5)
Prix fixe hors TVA
81 250 €
Année de construction
2025
État
Neuf
(entièrement fonctionnel)
Emplacement
Würzburg 

Données de base
- Désignation de la machine:
- Paint shop
- Fabricant:
- Pony Luxury Coating
- Modèle:
- Pony L11000 (11x5x5)
- Année de construction:
- 2025
- État:
- nouveau
- Fonctionnalité:
- entièrement fonctionnel
Prix et localisation
Prix fixe hors TVA
81 250 €
- Emplacement:
- Schulstr 3, 97084 Würzburg, Deutschland

Appel
Détails techniques
Dimensions et poids
Longueur totale:
11 200 mm
Largeur totale:
5 100 mm
Hauteur totale:
5 600 mm
Hauteur intérieure:
4 970 mm
Longueur intérieure:
11 000 mm
Largeur intérieure:
5 000 mm
Moteur et boîte de vitesses
Carburant:
gaz de pétrole liquéfié (GPL)
Détails de puissance
Tension d'entrée:
380 V
Fréquence d'entrée:
50 Hz
Consommation d'énergie:
45 kWh
Type de courant d'entrée:
triphasé
Équipement
Éclairage
Documentation et certification
Durée de la garantie:
24 mois
Matériau/produits transformables
Épaisseur de tôle acier (max.):
2 mm
Plus de détails
Puissance:
45 kW (61,18 ch)
Demande d'air:
52 000 m³/h
Capacité de chauffage:
250 kW (339,91 ch)
Épaisseur d'isolation:
50 mm
Puissance nominale:
250 kW (339,91 ch)
Température:
80 °C
Détails sur l'offre
- Identifiant de l'annonce:
- A19572531
- Mise à jour:
- dernière mise à jour le 15.01.2026
Description
* Air Preparation Unit:
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
Chsdpfxewzl Hxe Ac Ujd
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
L'annonce a été traduite automatiquement et des erreurs de traduction peuvent apparaître.
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
Chsdpfxewzl Hxe Ac Ujd
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
L'annonce a été traduite automatiquement et des erreurs de traduction peuvent apparaître.
Documents
Fournisseur
Remarque : Inscrivez-vous gratuitement ou connectez-vous, pour accéder à toutes les informations.
Enregistré depuis: 2025
6 annonces en ligne
Envoyer une demande
Téléphone & Fax
+49 931 4... afficher
Ces annonces pourraient également vous intéresser.
Réussite :
Votre message a été envoyé.
Annonce
Petershagen
371 km
Remorque surbaissée
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Réussite :
Votre message a été envoyé.
Annonce
Kežmarok
1 154 km
Tunnel de séchage UV
SuperficiEssiccatoio UV
SuperficiEssiccatoio UV
Réussite :
Votre message a été envoyé.
Annonce
Deskle
838 km
Unité de sablage
COGEIMPG 10x15
COGEIMPG 10x15
Réussite :
Votre message a été envoyé.
Annonce
Gütersloh
314 km
Cintreuse à rouleaux Stölting RA 2000 x 8 mm
StöltingRA 2000 x 8 mm
StöltingRA 2000 x 8 mm
Réussite :
Votre message a été envoyé.
Annonce
Deskle
838 km
Unité de sablage
TECNOBLASTGHIBLI 500 S - 9x13
TECNOBLASTGHIBLI 500 S - 9x13
Réussite :
Votre message a été envoyé.
Annonce
Friesenheim
341 km
Machine à cintrer les ronds
HaeuslerEVO 31031 4-Walzen Blechbiegemaschine
HaeuslerEVO 31031 4-Walzen Blechbiegemaschine
Réussite :
Votre message a été envoyé.
Annonce
Finlande
1 815 km
Unité de sablage
Gietart
Gietart
Réussite :
Votre message a été envoyé.
Annonce
Büyükkayacık OSB
2 618 km
Voiture transportant une semi-remorque
LiderTruck Carrier 1
LiderTruck Carrier 1
Réussite :
Votre message a été envoyé.
Annonce
Eisenberg (Pfalz)
279 km
Installation de revêtement par poudre
Gema, CaldanMagic Compact BA04, Hängebahnanlage Powe
Gema, CaldanMagic Compact BA04, Hängebahnanlage Powe
Réussite :
Votre message a été envoyé.
Annonce
Würzburg
402 km
Atelier de peinture
Pony Luxury Coating M&KPony 7000
Pony Luxury Coating M&KPony 7000
Votre annonce a été supprimée
Une erreur est survenue































































































