Paint shopPony Luxury Coating M&K
Pony 7000
Paint shop
Pony Luxury Coating M&K
Pony 7000
Prix fixe hors TVA
42 450 €
Année de construction
2025
État
Neuf
Emplacement
Würzburg 

Données de base
- Désignation de la machine:
- Paint shop
- Fabricant:
- Pony Luxury Coating M&K
- Modèle:
- Pony 7000
- Année de construction:
- 2025
- État:
- nouveau
Prix et localisation
Prix fixe hors TVA
42 450 €
- Emplacement:
- Schulstr 3, 97084 Würzburg, Deutschland

Appel
Détails techniques
Dimensions et poids
Longueur totale:
7 000 mm
Largeur totale:
3 000 mm
Hauteur totale:
4 000 mm
Moteur et boîte de vitesses
Carburant:
gaz de pétrole liquéfié (GPL)
Détails de puissance
Tension d'entrée:
380 V
Consommation d'énergie:
40 kWh
Équipement
Éclairage
Documentation et certification
Durée de la garantie:
24 mois
Plus de détails
Puissance:
40 kW (54,38 ch)
Demande d'air:
36 000 m³/h
Capacité de chauffage:
345 kW (469,07 ch)
Matériau d'isolation:
Mineralwolle
Épaisseur d'isolation:
50 mm
Puissance nominale:
345 kW (469,07 ch)
Température:
80 °C
Détails sur l'offre
- Identifiant de l'annonce:
- A19572801
- Numéro de référence:
- L7000
- Mise à jour:
- dernière mise à jour le 15.01.2026
Description
MAIN STANDARD
Our paint booths are designed to meet all necessary requirements for paint application, including air filtration, extraction, lighting, and a controlled environment. Booth processes are managed via a PLC system, ensuring that desired values are maintained consistently.
OPERATING PRINCIPLES OF THE BOOTH
The booth’s processes are managed through a control panel, which oversees the following steps:
PAINTING PROCESS
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled through the extraction unit. Floor filters (paint stop filters) collect paint particles, and the air passes through final exhaust filters before being discharged.
Credpjwzmcbjfx Acqoi
FLASH-OFF PROCESS
After painting, the booth continues operating for approximately 15 minutes to purge residual solvents and thinners. During this phase, fresh air circulates from outside into the booth.
DRYING PROCESS
In this stage, 80% of the air passing through the booth is heated to 60°C and introduced via a distribution system. Since 20% of the solvent is released during drying, it is expelled with the exhaust air. Industrial coatings are typically dried at 60°C, but the booth temperature can be adjusted as needed via the control panel.
COOLING PROCESS
After the 30-minute drying cycle, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the subsequent 5-minute cooling phase, fresh air from outside circulates through the booth, after which the system shuts down automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT
These control panels govern the functions and operation of machines and devices housed within the booth. The panel is made of durable galvanized sheet and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical Equipment and Control Panel:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control connections between the control panel and motors or other electrical devices.
• Electrical wiring is designed to accommodate booth relocation if needed.
• Operating equipment uses 380 V 50 Hz, while control devices operate at 220 V.
• The booth’s operation time can be monitored on the electronic control panel, enabling straightforward maintenance scheduling.
• Temperature and time settings for booth ventilation (solvent flash-off), intermediate drying, and final drying can be easily adjusted to required values on the digital display of the electronic control panel.
• Users can monitor and adjust the drying time using the heating thermostat and time relay.
L'annonce a été traduite automatiquement et des erreurs de traduction peuvent apparaître.
Our paint booths are designed to meet all necessary requirements for paint application, including air filtration, extraction, lighting, and a controlled environment. Booth processes are managed via a PLC system, ensuring that desired values are maintained consistently.
OPERATING PRINCIPLES OF THE BOOTH
The booth’s processes are managed through a control panel, which oversees the following steps:
PAINTING PROCESS
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled through the extraction unit. Floor filters (paint stop filters) collect paint particles, and the air passes through final exhaust filters before being discharged.
Credpjwzmcbjfx Acqoi
FLASH-OFF PROCESS
After painting, the booth continues operating for approximately 15 minutes to purge residual solvents and thinners. During this phase, fresh air circulates from outside into the booth.
DRYING PROCESS
In this stage, 80% of the air passing through the booth is heated to 60°C and introduced via a distribution system. Since 20% of the solvent is released during drying, it is expelled with the exhaust air. Industrial coatings are typically dried at 60°C, but the booth temperature can be adjusted as needed via the control panel.
COOLING PROCESS
After the 30-minute drying cycle, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the subsequent 5-minute cooling phase, fresh air from outside circulates through the booth, after which the system shuts down automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT
These control panels govern the functions and operation of machines and devices housed within the booth. The panel is made of durable galvanized sheet and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical Equipment and Control Panel:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control connections between the control panel and motors or other electrical devices.
• Electrical wiring is designed to accommodate booth relocation if needed.
• Operating equipment uses 380 V 50 Hz, while control devices operate at 220 V.
• The booth’s operation time can be monitored on the electronic control panel, enabling straightforward maintenance scheduling.
• Temperature and time settings for booth ventilation (solvent flash-off), intermediate drying, and final drying can be easily adjusted to required values on the digital display of the electronic control panel.
• Users can monitor and adjust the drying time using the heating thermostat and time relay.
L'annonce a été traduite automatiquement et des erreurs de traduction peuvent apparaître.
Documents
Fournisseur
Remarque : Inscrivez-vous gratuitement ou connectez-vous, pour accéder à toutes les informations.
Enregistré depuis: 2025
6 annonces en ligne
Envoyer une demande
Téléphone & Fax
+49 931 4... afficher
Ces annonces pourraient également vous intéresser.
Réussite :
Votre message a été envoyé.
Annonce
Würzburg
402 km
Atelier de peinture
Pony Luxury Coating M&KPony 7000
Pony Luxury Coating M&KPony 7000
Réussite :
Votre message a été envoyé.
Annonce
Amurrio
1 005 km
Machine à rectifier les surfaces
GERRS 15/60
GERRS 15/60
Réussite :
Votre message a été envoyé.
Annonce
Dresden
648 km
Typographie
POLYGRAPHOM II
POLYGRAPHOM II
Réussite :
Votre message a été envoyé.
Annonce
Wöllstadt
306 km
Machine de formage, remplissage et scellage de sacs
Impuls PackagingFlowpack Multitalent 304 BF 200/80/600 P
Impuls PackagingFlowpack Multitalent 304 BF 200/80/600 P
Réussite :
Votre message a été envoyé.
Annonce
Petershagen
371 km
Remorque surbaissée
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Réussite :
Votre message a été envoyé.
Annonce
Gusselby
1 223 km
Scie de rip multi
ARIDS-73
ARIDS-73
Réussite :
Votre message a été envoyé.
Annonce
Deinze
85 km
Lot de 150 Tonnes de Boulonnerie
CHIEF / PGB FASTENER / FABORY
CHIEF / PGB FASTENER / FABORY
Réussite :
Votre message a été envoyé.
Annonce
Weilerswist
171 km
Remorque porte-voitures
TEMAREDCar Flat 3518 für PKW bis 1.438 kg - Kippbar
TEMAREDCar Flat 3518 für PKW bis 1.438 kg - Kippbar
Réussite :
Votre message a été envoyé.
Annonce
Aumühle
732 km
Profilés de construction, en forme de U, 2000mc
Réussite :
Votre message a été envoyé.
Annonce
Barcice Rososkie
1 171 km
MACHINE À CHANFREINER LES TUBES CNC
SMS MEER CNCRFA 14
SMS MEER CNCRFA 14
Votre annonce a été supprimée
Une erreur est survenue